CIPL Construction Industry Catania: New Lows

The Construction Fund of Catania has issued a document stipulating the new minimum wages for workers in the sector, effective from March 1, 2026.

The minimum hourly wage for construction workers is as follows:

– (IV Level) Fourth-level worker wage: Base salary is €9.04 with a territorial allowance of €1.51, a contingency allowance of €3.01, and an EDR of €0.06. The total stands at €13.62 with a Prevedi Fund set at 0.0959.
– (III Level) Specialized worker wage: The base pay is €8.40, territorial allowance is €1.39, a contingency allowance of €3.00, and an EDR of €0.06. The total is calculated to €12.85 with the Prevedi Fund set at 0.0890.
– (II Level) Qualified worker wage: The base pay is €7.56, a territorial allowance of €1.22, a contingency allowance of €2.99, and an EDR of €0.06. The total amounts to €11.83 with the Prevedi Fund set at 0.0801.
– (I Level) Common worker wage: The base pay stands at €6.46, with a territorial allowance of €1.04, a contingency allowance of €2.96, and an EDR of €0.06. The total comes to €10.52 with the Prevedi Fund set at 0.0685.
– Disc 90% wage: The base pay is €5.81 with a territorial allowance of €1.36, a contingency allowance of €2.47, and an EDR of €0.05, summing up to €9.69 in total and the Prevedi Fund set at 0.0570.
– Disc 80% wage: €5.17 base pay, with a territorial allowance of €1.21, a contingency allowance of €2.47, and an EDR of €0.04. The total amounts to €8.89 with the Prevedi Fund set at 0.0570.

Minimum monthly wages (building employees):
– (VII Level): Base salary €2,234.71, production premium €370.92, a contingency allowance of €533.82, an EDR of €10.33. The total salary stands at €3,149.78 with a Prevedi Fund at €20.00.
– (VI Level): Base pay €2,011.23, production premium €336.55, a contingency allowance of €529.63, an EDR of €10.33. The total amounts to €2,887.74 with a Prevedi Fund at €18.00.

The list proceeds through levels V (€2,488.47 total, €15.00 Prevedi fund), IV (€2,349.67 total, €14.00 Prevedi fund), III (€2,212.87 total, €13.00 Prevedi fund), II (€2041.00 total, €11.70 Prevedi fund), to level I (€1,817.67 total, €10.00 Prevedi fund), detailing base pay, production premium, contingency allowance, EDR, Total and Prevedi fund for each level.

Iscriviti alla nostra newsletter

Ricevi aggiornamenti utili per la tua attività

Condividi questo articolo

Ti potrebbe anche interessare...

News Fisco

Assemblee nelle SRL

La normativa riguardante le riunioni dei soci nelle società a responsabilità limitata è prevista dall’articolo 2479-bis del codice civile italiano.

Read More »

Vuoi approfondire l'argomento ?

scrivici o telefonaci se vuoi maggiori informazioni

Red telephone on wooden table with notepad
Torna in alto